Independent power producer, Chibombo, Zambia

Solar power the grid can count on after sunset.

Yala Energy Limited is developing the Muchenje Solar PV Plant, 20 MWp of generation with battery storage, 8.2 km from a new ZESCO substation in Chibombo District. We develop, own and operate. ZESCO takes the power.

+ +
Project at a glance
20 MWp Installed solar capacity
40 to 60 MWh Lithium-ion storage
8.2 km 33 kV line to the ZESCO substation
25 years Design life
+ +

Who we are

A Zambian company set up to build one project properly, then repeat it.

Yala Energy Limited was incorporated in Zambia on 9 June 2026 as a private company limited by shares. The mandate is deliberately narrow: develop, own and operate renewable generation that adds firm capacity to the national grid.

The company is wholly Zambian owned. We hold the Muchenje site under a 99-year leasehold title, and we are structuring the project to the standards lenders and ZESCO expect before a power purchase agreement is signed.

+ +
Aerial view of a fixed-tilt utility-scale solar array
Fixed-tilt rows at utility scale, the layout Muchenje will use across 41 hectares Reference image
+ +

What we deliver

Generation, storage and the line that connects them to the grid.

Solar on its own drops off at the worst time of day for a utility. Muchenje pairs the array with storage so the capacity we sell holds into the evening peak.

+ +
Close view of fixed-tilt photovoltaic module rows
01

Solar PV generation

High-efficiency monocrystalline modules across 41 hectares of flat ground that receives 5.5 to 6.0 kWh per square metre per day.

+ +
+ +
Solar modules catching low evening sun
02

Battery energy storage

A 40 to 60 MWh lithium-ion system absorbs the midday surplus and releases it when demand climbs, which turns variable output into firm capacity.

+ +
+ +
A solar array still generating at dusk
03

Grid interconnection

An 8.2 km overhead 33 kV line runs from the plant to a new ZESCO 33/11 kV substation. Short route, low losses, quick to build.

+ +

Flagship project

Muchenje Solar PV Plant, Chibombo District

The site sits in the Chieftainess Mungule area, on 41 hectares held under a 99-year leasehold title owned by the sponsors. The ground is flat, which keeps civil works down and makes the evacuation line straightforward to build.

41 ha Titled land, 99-year lease
USD 31m Estimated capital cost including the 33 kV line
5.5 to 6.0 kWh per square metre per day of solar yield
33/11 kV New ZESCO substation at the delivery point

Why now

Zambia has run out of room to depend on rain.

85% Share of national generation that comes from hydropower, which is why a dry season turns into load shedding.
2019 The National Energy Policy opened generation to private producers and set out cost-reflective tariffs.
8NDP The Eighth National Development Plan puts private investment in generation at the centre of energy security.

We are looking for one equity partner.

Capital, technical depth and a long view. If that is you, we will send the feasibility work, the land title and the interconnection study.