Flagship project

Muchenje Solar PV Plant, 20 MWp with storage.

Chieftainess Mungule area, Chibombo District, Central Province. Forty one hectares of titled land, nine kilometres from a new ZESCO substation.


The site

Chosen for the connection, not just the sunshine.

Most solar sites in Zambia have good irradiance. Far fewer have flat ground, clean title and a substation within a short line route. Muchenje has all three, which is why it can reach financial close on a realistic timetable.

The parcel is held under a 99-year leasehold title owned by the sponsors, so there is no land assembly risk and no dispute to resolve before construction. The flat topography keeps earthworks and drainage costs down and makes the 33 kV evacuation line simple to build.

+ +
Site record
Location Chieftainess Mungule area, Chibombo District, Central Province
Land 41 hectares, Farm No. L/Chibo/1469453
Tenure 99-year leasehold title held by the sponsors
Terrain Flat, low civil works requirement
Solar yield 5.5 to 6.0 kWh per square metre per day
+ +

The solar resource

Where Chibombo sits on the national irradiation map.

Central Province receives a daily average in the 5.5 to 6.0 kWh per square metre band. The map below is the World Bank Global Solar Atlas layer for Zambia, measured over 1994 to 2017.

+ +
World Bank global horizontal irradiation map of Zambia showing daily totals by region
Global horizontal irradiation, Zambia. Kabwe and Lusaka bracket the Chibombo site. World Bank Group, ESMAP and Solargis
+ +

Technical summary

What gets built.

20 MWp Monocrystalline PV, fixed-tilt or single-axis tracking
40 to 60 MWh Lithium-ion battery storage, integrated on site
8.2 km Overhead 33 kV evacuation line to the delivery point
33/11 kV New ZESCO substation receiving the power
+ +
Capital and commercial
Estimated capex USD 31 million including the 33 kV line
Benchmark Costed against comparable medium-scale IPPs in the region
Offtake Power purchase agreement with ZESCO, firm capacity from storage
Design life 25 years
Structure Single-asset project company, equity partner sought
+ +

Money and offtake

USD 31 million, and a tariff that has to stand up.

The capital estimate covers modules, inverters, balance of plant, the battery system and the 33 kV line, benchmarked against similar projects in southern Africa rather than a global average.

On the revenue side, storage is what makes the number work. Firm evening capacity is worth more to the system than midday energy, and it is what lets a tariff survive scrutiny from the regulator and from lenders.


Where the project stands

Development sequence.

01

Land and company in place

Company incorporated, 41 hectares held under title, site identified against the new substation. Complete.

02

Feasibility and technical design

Resource assessment, plant layout, storage sizing and the interconnection route. In progress.

03

Equity partner and permits

Partner selection alongside the generation licence application, environmental and social approval and land conversion. Open now.

04

Offtake and financial close

Power purchase agreement with ZESCO, tariff approval, debt package and EPC award.

05

Construction and commissioning

Build the array, the battery system and the evacuation line, then commission into the grid and begin the 25-year operating period.


Alignment

Why the project fits national and global policy.

+ +
SDG 7

Affordable and clean energy

Adds non-hydro renewable capacity to a system that depends on rainfall for most of its generation.

+ +
+ +
SDG 13

Climate action

Displaces emergency thermal generation and imported power during dry years.

+ +
+ +
SDG 8

Work and growth

Construction employment, trade training and a permanent operations team in Chibombo District.

+ +
+ +
Zambia

National Energy Policy 2019

Directly supports the policy's private generation and diversification objectives and the 8NDP investment targets.

+ +

The project file is ready to share.

Feasibility work, land title, interconnection study and draft offtake terms, released under a mutual confidentiality agreement.