Services
Generation, storage, interconnection and the work that makes them bankable.
We take a project from titled land through to a signed power purchase agreement and then run it for twenty five years.
Three pillars
What the plant is made of.
Each pillar is sized against the site rather than against a catalogue. The numbers below are from the Muchenje feasibility work.
Solar PV generation
High-efficiency monocrystalline modules on fixed-tilt or single-axis tracking mounts, with string or central inverters and step-up transformers on site.
20 MWp across 41 hectares
Site yield of 5.5 to 6.0 kWh per square metre per day
Flat topography, low civil works cost
Battery energy storage
An integrated lithium-ion system that holds the midday surplus and dispatches it into the evening peak, so the offtaker buys firm capacity instead of a forecast.
40 to 60 MWh of usable storage
Smooths intermittency and supports grid stability
Sized to the shape of the ZESCO demand curve
Grid interconnection
We build and own the evacuation line to the delivery point, which keeps the connection on our critical path rather than someone else's.
8.2 km overhead 33 kV line
New ZESCO 33/11 kV substation at the delivery point
Short route keeps losses and land access simple
How we work
From titled land to a signed offtake.
Secure land and grid access first
We start from land we own the rights to. Muchenje sits on 41 hectares under a 99-year leasehold title, chosen because a new ZESCO 33/11 kV substation is within nine kilometres.
Measure the resource, then design to it
Module choice, tilt and tracking are set against measured irradiance and temperature at the site, not a regional average. That is what the yield model and the lenders technical adviser will be tested against.
Size the storage to the offtaker's problem
The battery is specified around when ZESCO actually needs capacity. That changes the value of the plant to the system and makes a firm tariff defensible.
Permits, safeguards and the offtake in parallel
Generation licence, environmental and social approval, land conversion and the power purchase agreement move together, because sequencing them one after another is how projects lose two years.
Build, then operate for twenty five years
Construction under a fixed-price contract with an experienced EPC, then a resident operations team, scheduled maintenance and reporting against the design life of the plant.
Standards we work to
The paperwork is part of the engineering.
An independent power producer lives or dies on whether a lender believes the file. We keep the compliance work current rather than assembling it at the end.
Licensing and tariff approval through the Energy Regulation Board
Environmental and social approval through ZEMA
Environmental and social management to international lender standards
Audited accounts and transparent shareholder reporting
Grid code compliance agreed with ZESCO before construction
Who this is for
The people we are built to work with.
ZESCO
Firm, dispatchable capacity on the Central Province network, delivered at a new substation with a metered connection we build ourselves.
Equity partners
A shovel-ready 20 MWp project with land title in hand, Zambian sponsors who know the sector, and room for a partner who brings capital and technical depth.
Lenders and DFIs
A single-asset project company, ring-fenced accounts, and safeguards documentation prepared to the standards development finance asks for.
Tell us what you need to see.
Feasibility study, yield model, land title, interconnection study or the draft offtake terms. We will send what is relevant to your review.